大黄免费网站,一级a性色生活片久久毛片,翔田千里在线精品视频,操二区

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: m.hangtaiwealth.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
久久精品国产亚洲AV无码不卡| 九色九色永久网站| 国产日本精品久久| 三上悠亚在线播放| 欧美另类丰满熟妇乱xxxxx| 九九热官方网站| 亚洲精品视频在哪里看| 免费精品一区二区三区第35| 中国老太婆性毛茸茸| 精品久久久久久久中文| 日韩综合中文字幕| 人妻天堂亚洲欧美| 亚洲av资源| 日韩第一页| 91成人.com| 国产婬乱a一二三四区毛片多女| 亚洲福利| 日韩成人av| av不卡一区| 日韩性爽| 日本91av| 91欧美一区二区| 大香蕉东京热| 东乌珠穆沁旗| 人妻体内射精一区二区| 亚洲天堂网络| 欧美精品日韩中文字幕| 人妻66| 欧美| 少妇高潮惨叫久久久久| 亚洲乱码一二页在线观看| 色一情一乱一乱一区免费网站| 毛片色毛片18毛片美女| 东阿县| 大色欧美3| 国产精品亚洲av狼人三区| 成人婷婷网| 韩国电影三级中文字幕hd| 免费人成视频| 益阳市| 欧美日韩国产精品成人|